Birth Date: | 26 February 1989 (36 Years old) |
Experience: | 1 Years |
Minimum Salary: | 0 United States Dollar |
Gender: | Male |
Nationality: | Egypt |
Profile Visibility: | Public. Anyone can see my profile. |
Faculty of engineering _Tanta university
Grade: Good
Drake & Scull International PJSC. | Egypt
• Installation and Supervision of all the Project Substations (switch gears, Air circuit breakers , 11KV Dry type Transformers , RMU, MDB ,MCC, ATS, etc…..)
• Pulling and termination of 11KV Medium voltage cables (Utility switchgears, Client switchgears, RMU’s, Transformers, generators).
• Pulling, termination, & arrangement of Low voltage Network Cables with reference to the Voltage drop calculations.
• Installation and Supervision of Bus way system (4000A) & (2500A) (Spectra GE).
• Pre-Commissioning of all the electrical systems with the assist of the suppliers (switch gears, Air circuit breakers , 11KV Dry type Transformers , RMU, MDB ,MCC, ATS, etc…..)
• Installation of Cable trays & Cable Ladder.
• Installation of Secondary earthing network.
• Installation of lighting system.
• Installation of LMS (Load management System), & BMS (Building Management System).
• Installation of the Small power system.
• Site Coordination with all the project parties Such as mechanical, & Civil Contractors.
• Implementation of as built shop drawings of all DSIC Scope.
• Ensures that all site works are done according to all applicable quality standards
• Manpower Allocation.
• Supports the Asst. construction Manager in accomplishing all the goals and targets for the electrical groups at site
• Implementation of the Daily & Monthly Site Activities Reports.
• Preparation of WIRS.
• Handing over the installation activities with the main contractor and the Consultant.
• Attending all the meetings with the client.• Implementation of the materials takes off from shop drawings.
• To give full and extensive instruction to his team.
• Analyzing and resolving field problems.
• Committed to DSI HSE requirements and all applicable legislation and contractual requirements affecting the HSE activities at project site and administrative offices
ELNAMAKKY FOR ENGINEERING CONSULTION AND TRADE | Egypt
• Installation of low voltage panels for various application.
• Maintenance of low voltage panels for various application.
• Making of Test and Commissioning for low voltage panels.
• Making of Shop drawings.
• Making of As Built drawings.
• Low voltage cable termination.
• Electrical quantities surveying.
• Pricing of low voltage panels for various applications.
jelecom
Total Hours: 36
Total Hours: 36
south delta for electricity distribution
Total Hours: 40
• Basement garage (level B4-B1 as an entire development)
• Podium (level 00-07 as a hotel operated ballroom, meeting rooms and restaurants, (includes office and retail areas).
• Tower 1 (levels 3-32 as a hotel luxury serviced apartments).
• Tower 2 (levels 1-18 as a hotel suites ,levels 19-29 as a hotel serviced apartment and levels 30-35 as a hotel luxury serviced apartments)
Very Good |
Native |