Digital Implementation Coordinator (JO022242) 

سلطنة عمان

We are looking for a Digital Implementation Coordinator for one of our clients with the following details: (candidates based in Oman preferred) 



Start Date: March 2026 (tentative) 



Contract duration: 12 months (renewable) 



Location: Sohar, Oman 



Work status: Resident, Single



QUALIFICATIONS & EXPERIENCE 




  • Master degree in Data Science.

  • Excellent knowledge of written, read, and spoken English (required)

  • Professional Experience: +10 years’ Experience in Digital Solution implementation in an Oil and Gas context (Project and Operation).

  • Experience in similar position (years): +5 years’ experience.

  • Technical Skills

    • Data Tech

    • IT Framework

    • IA tools

    • Machine Learning Tools

    • Lagila project Management

    • Product Manager / Owner

    • Product and UX design approaches & frameworks

    • Programming Languages (python, etc...)

    • Safety of personnel and installations

    • Commissioning and start-up of O&G facilities




ACTIVITIES 



Project Phase: 



Commissioning and Start-up preparation:




  • Ensure the quality and completeness of Quantum/ Data engineering Final Documentation (deliverables both from the Contractor and the Vendors) in compliance with Project Scope of Work, Specifications and Procedures and allowing an adequate hand-over to the Operation.

  • Review and approve the sub-system breakdown definition developed by the Contractor.

  • Review and approve Breakdown P&ID mark-ups.

  • Ensure Preparation and Population of the Pre-commissioning and Commissioning EasyPlant Database are timely prepared.

  • Ensure EasyPlant Database is updated according to engineering progress.

  • Verify consistency of pre-commissioning EasyPlant database versus Contractors actual (pre)commissioning progress.

  • Ensure each select Tools/Solutions bring Value to Business (Cost Vs value stream).

  • Assist the CSL in identifying and addressing all internal/external interface issues with respect to Commissioning and Start-up.


Commissioning and Start-up execution:




  • Ensure Digital tools are deployed and proven effective. Consider Obsolescence and lifecycle need.

  • Ensure Digital Tool to provide the best performance for PROJECT LNG.

  • Assist commissioning, start up and Operation team when required.

  • Ensure the progress is in accordance with priorities driven by the Commissioning and Start-up sequence.

  • Ensure a particular overall tracking for punch list entry and clearance activities (sort according to site priorities level, control delivery date for spares/equipment…etc.).

  • Ensure Contractor provide EasyPlant trainings to PROJECT LNG Team

  • Ensure Contractor provide good level of EasyPlant access to PROJECT LNG team.

  • Coordinate checks and audits to secure EasyPlant progress and quality.

  • Review and comment the Commissioning progress reports issued by the Contractor.

  • Ensure that each Sub-system has reached the “RFC” or the “AOC” status with associated punch list.

  • Participate actively in overall commissioning schedule, planning and optimization activities.

  • Report immediately any unexpected events which may affect the Commissioning of the plant or the Start up.

  • Ensure all required Inspection Test Records as defined by the Handover procedure for Completion purposes (RFC and AOC dossiers compilation among other) are timely prepared.

  • Work closely with Company and Contractors pre-commissioning and commissioning Leaders.

  • Liaises with Completion Coordinator.

  • Ensure Contractors report comprehensively EasyPlant status, including performed man hours, and punch list management progress.

  • Ensure a smooth handover (feedback and training) to the Field Operations Team.

  • Train or familiarize each Stakeholder as needed.